one shot chocolate depositor machine,chocolate depositing line,automatic chocolate depositing line Chengdu LST Science&Technology Co., Ltd. , https://www.lstmachinery.com
In February 2008, the National Development and Reform Commission approved China Hydropower Construction Group Sichuan Electric Power Development Co., Ltd. to construct the Sichuan Heihe River Maoergai Hydropower Station. The project is located in the middle reaches of the Heishui River in Heshui County, Aba Tibetan and Qiang Autonomous Prefecture, Sichuan Province, and builds three 140,000 kW mixed-flow hydroelectric generating units with a total installed capacity of 420,000 kilowatts.