December 22, 2024

The second-tier first-class highway construction project started

The second-tier first-class highway construction project started According to reports, the former S201 Provincial Second Line (Daxie to Erduguan) is a Grade II highway. It is divided into three blocks from the middle of the Wuyuan County through the S304 provincial highway and the Taoyuan Line. As Wuyuan County is the most beautiful village in China, it has attracted tourists from all over the country and even from around the world. The frequency of car-resistance phenomenon has greatly increased, and it has a greater impact on the creation of national-level scenic tourist areas in Wuyuan County. It also affects local residents and mass production. , life, and often constitute a serious traffic accident hidden dangers. Therefore, the project was listed in the “Twelfth Five-Year Plan” of provincial highways in the general country, and it was relocated outside the urban area. The total length was 10.11 kilometers, and the design grade was a two-way, four-lane highway (planning area taking into account the urban road function). Among them, the K36+700-K45+110.599 roadbed is 23m, the K15+110.599-K46+809.792 roadbed is 25m, and the project budget is 20,753,240,000 yuan. The construction period is expected to be 2 years.

Shipping Box With Handle

Shipping Box With Handle,Reusable Thermal Packaging,Aluminum Foil Box For Food Packaging,Insulated Foam Foil Boxes

Huizhou Green Foil Insulation Co., Ltd , https://www.hzthermalbags.com