November 02, 2024

Injection Mould/Plastic Mould/Auto Injection Mould/Auto Trim Plastic Mould

Model NO.: HRD-A110106
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Mould Life: 50~100 Shots
Mould Steel: 2738hh,Nak80,738,2344,S136,Sdk61,P20,Px5
Applicable Range: Automotive Mould
Trademark: Higrade/Injection mould
Transport Package: Wood Case
Specification: ISO9001: 2008
Origin: Qingdao China
HS Code: 8480790090
Injection Mould/Plastic Mould/Auto Injection Mould/Auto Trim Plastic Mould
Injection Mould/Plastic Mould/Auto Injection Mould/Auto Trim Plastic MouldInjection Mould/Plastic Mould/Auto Injection Mould/Auto Trim Plastic MouldInjection Mould/Plastic Mould/Auto Injection Mould/Auto Trim Plastic MouldInjection Mould/Plastic Mould/Auto Injection Mould/Auto Trim Plastic Mould




Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100 shots
Material: PP
Cavity: 1*1
Applicable range: Automotive mould  
Lead Time: 35-45 days
Hot runner:Yes (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.

Process step: product design-CAE-3D mold design-2D drawing-CAM-milling machine-grinder-drill-CNC-wire cutting-EDM-polishing-trial assembly-grind-assemble-first trial

Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
 Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's request
Packing: Wooden Case

The first trial success rate is above 95%
Quotation : provide quotation in 24hours after received the customer's drawing .
Design software: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet the customer request of batch production.
Quality department:15 members quality control workers, testing the mould and parts by CMM and projector.
Domestic delivery: logistics transportation
Delivery to overseas: FOB/CIF/DDU by sea shipping or air shipping

 In strict accordance with ISO 9001:20015 and EN Flanges;
    1.Make process card and quality plan
    2.Choose the qualified raw material and do incoming test, not allowed      
     nonconforming material to enter into production process;
    3.Producing and testing followed the quality documents 
    4.Be good at Quality records and product identification to ensure the product 
    traceability
    5.Do the final inspection to ensure 100% of pass.

En Flanges

En Flanges,En 1092 Flange ,En Flange Stainless,High Quality En Flanges

Shanxi Tianbao Group Co.,Ltd. , https://www.tbflange.com