February 23, 2025

Jinan Shunhe Expressway South Extension started on November 12

According to reports, the project starts from the heroic mountain interchange in the north and the south to the south is high-speed, 5.1 km long. It is the main artery on the central axis of the high-speed integrated road network.

The construction contents of the project include tunnels + overpass bridges + ground express roads, ground roads, bridges, rainwater, sewage, street lamps, transportation facilities, road greening and water supply, heat, telecommunications, gas and other pipelines; and new BRT platform 5 There are 2 pedestrian bridges across the street; the southern end is connected with the south and the city is transformed into a south-city interchange.

Hero Mountain Interchange - Beikang North Road is a ground expressway, independent slow lane and roadside BRT platform, and the surrounding residents are more convenient to travel.

Beikangbei Road-Beiliu Road is an underground expressway with a length of about 1.6 kilometers. There are five pairs of entrances and exits (South of Xiuxiu Road, North of Beikang North Road, North of Dagugou Road, South of Dagugou Road). On the north side of the city and the south side of the city interchange, to meet the needs of the citizens in the Nanbei Kang area and the leading area. The two-way eight-lane auxiliary road is reserved on the ground, and the central island station type BRT platform is used, and the transfer is completed without leaving the station.

North Sixth Road - Dagugou Bridge This section adopts a flyover bridge with a length of about 800 meters to ensure independent passage of vehicles, which is convenient for pedestrians and non-motor vehicles to cross the street quickly.

Dagugou Bridge—The South Ring Road is a ground expressway, which is connected with the south city interchange to realize the rapid evacuation of urban vehicles.

After the completion of the project, Jinan will realize rapid communication between the north and the south, and the two horizontal and vertical vertical roads will be closed-loop.

Related News: Construction Work Highway Construction

Polyethylene Glycol

Polyethylene Glycol,Polyethylene Glygcol,Poly Ethylene Glycol,Polyethylene Glycol Series

Jiangsu Zhongluman New Material Technology Co., Ltd , https://www.zjrozhmch.com